Risk Mitigation of Toll Road Development (Case Study of Trans Sumatera Toll Road)

Authors

  • I Wayan Mandia
  • Putu Ika Wahyuni
  • I Nengah Sinarta

DOI:

https://doi.org/10.21776/ub.civense.2022.00502.9

Keywords:

construction, toll road, risk, soft soil.

Abstract

To achieve the level of infrastructure performance as a middle-income country by 2025, as well as to catch up with the backwardness of infrastructure, specifically for toll road projects, the government targets that by 2021 Indonesia will have 5200 km of toll roads. Hence, there is a significant increase of 3000 km. The government, especially in the development of toll road infrastructure, gives a more significant portion to the purely private sector, BUMN, and Public Private Partnership - Government Business Entity Cooperation. Risk analysis is carried out by structuring risk using the RBS (Risk Breakdown Structure) method and multiplying the impact value and frequency to get the risk level value for each risk factor. The results of the analysis obtained from RBS are further analyzed based on the practical experience of project implementers to determine their actions in overcoming risks, then analyzed and discussed again using a table comparing the amount of risk, comparison of the level of importance of risk (importance level) and the level of risk based on the payment system. The results obtained from this study are the types of risk and the level of risk at each stage of the project.

References

Pemerintah, “Peraturan Pemerintah (PP) tentang Perubahan Peraturan Pemerintah Nomor 15 Tahun 2005 Tentang Jalan Tol,” Jakarta, 2009.

& I.-A. D. B. World Bank, Asian Development Bank, Kemitraan Pemerintah Swasta Panduan Refrensi Versi 2.0. Terjemahan oleh Indonesia Infrastructure Guarantee Fund. Jaakarta: PT. Penjamin Infrastruktur Indonesia. 2014.

Y. Hardiyan, “Setelah Mangkrak 21 Tahun, Presiden Jokowi Resmikan Tol Ciawi-Cigombing,” Ekonomi Bisnis, 01-Dec-2018. .

Indonesia Infrastructure Guarantee Fund, “Kerjasama Pemerintah Swasta di Indonesia Acuan Alokasi Risiko,” PT. Penjamin Infrastruktur Indonesia, 2014. .

E. Darma, “Analisis Manajemen Risiko Dan Pengendalian Intern Pada Pengadaan Jasa Konstruksi (Studi Kasus Pengadaan Jasa Konstruksi Pada SKPD Di Lingkungan Pemerintah Provinsi Sumatera Barat),” J. Pembang. Nagari, vol. 2, no. 2, pp. 16–28, 2017.

C. Yuliana, “Manajemen Risiko Kontrak Untuk Proyek Konstruksi,” Rekayasa Sipil, vol. 11, no. 1, pp. 9–16, 2017.

R. Hidayati, M. Natalia, F. Adibroto, and R. Saskia, “Analisis Variabel-Variabel Risiko pada Pelaksanaan Proyek Konstruksi Jalan,” J. Ilm. Rekayasa Sipil, vol. 14, no. 2, pp. 46–56, 2017.

A. Setiawan, E. Walujodjati, and I. Farida, “Analisis Manajemen Risiko Pada Proyek Pembangunan Jalan Tol Cisumdawu (Studi Kasus: Development Of Cileumyi-Sumedang Dawuan Toll Road Phase I),” 2014.

K. Putri and P. Marzuki, “Model of land acquisition productivity performance for toll road projects in Indonesia,” Civ. Environ. Sci., vol. 003, no. 02, pp. 84–94, Oct. 2020.

A. Nurdiana and B. Setiabudi, “Aplikasi Manajemen Risiko Pada Proyek Jalan Tol Semarang-Solo Ruas Bawen-Solo,” 2018.

N. Rahmawati and A. T. Tenriajeng, “Analisis Manajemen Risiko Pelaksanaan Pembangunan Jalan Tol (Studi Kasus : Proyek Pembangunan Jalan Tol Bekasi-Cawang-Kampung Melayu),” Rekayasa Sipil, vol. 14, no. 1, 2020.

E. V. Dewi and N. A. Wessiani, “Analisis Penilaian Usaha dan Manajemen Risiko pada Keputusan Kelayakan Investasi dengan Mempertimbangkan Ketidakpastian (Studi Kasus : Akuisisi Jalan Tol oleh PT. X),” J. Tek. ITS, vol. 10, no. 2, pp. 121–128, 2021.

E. J. Voughan, Fundamental of Risk and Insurance, 2nd ed. New York: John Willey & Sons, Inc., 2018.

M. Zulfiqar and A. Sandhyavitri, “Analisis Risiko Pembangunan Jalan Tol Pekanbaru-Dumai Pada Tahap Konstruksi (Studi Kasus Jalan Tol Pekanbaru-Dumai),” J. Online Mhs. Bid. Tek. dan Sains, vol. 1, no. 1, 2014.

I. Nyoman, M. Jaya, D. K. Sudarsana, G. A. Kade, and I. Wiratni, “Manajemen Risiko Terhadap Pelaksanaan Proyek Konstruksi Hotel Di Kawasan Sarbagita,” J. Spektran, vol. 7, no. 1, pp. 51–57, 2019.

I. Norken, I. B. N. Purbawijaya, and I. G. N. O. Suputra, Pengantar Analisis dan Manajemen Risiko pada Proyek Konstruksi. Denpasar: Universitas Udayana Press, 2015.

Badan Standarisasi Nasional, Persyaratan Perancangan Geoteknik SNI 8460:2017. Jakarta: Badan Standarisasi Nasional, 2017.

Anonim, “Brainwriting Enabling Everyone to Share Their Creative Ideas.” .

A. Zatar, P. B. Katili, and Suparno, “Penentuan Kriteria Kualitatif Penentu Dalam Pemilihan Objek Audit Internal Menggunakan Metode Delphi (Studi Kasus: Dana Pensiun PT. X),” J. Tek. Ind. J. Ilmiah, Keilmuan dan Penerapan Tek. Ind., vol. 4, no. 1, 2016.

H. Linstone and M. Turoff, The Delphi Method: Techniques and Applications. 2002.

PT Penjamin Infrastruktur Indonesia, Acuan Alokasi Risiko 2020. Jakarta: PT Penjamin Infrastruktur Indonesia, 2020.

M. Natalia et al., “Identifikasi Faktor-Faktor Penyebab Cost Over Run pada Proyek Konstrusi Jalan di Sumatera Barat.,” JIRS, vol. 16, no. 1, pp. 28–38, 2019

Downloads

Published

2022-10-31

How to Cite

[1]
I. W. . Mandia, P. I. Wahyuni, and I. N. Sinarta, “Risk Mitigation of Toll Road Development (Case Study of Trans Sumatera Toll Road)”, CIVENSE, vol. 5, no. 2, pp. 202–214, Oct. 2022.

Issue

Section

Articles